Switch the 3D-360 experience between tour stops 2 and 5.
Tour stop 2: In front of "Out of the Blue" (west side of Main Ave between College Dr and 7th St.)
Tour stop 5: In front of "El Rancho" (southwest corner of Main Ave and 10th St.)
To enjoy this experience, walk to either tour stop 2 or 5 and face the street.
Tour stop 2: In front of "Out of the Blue" (west side of Main Ave between College Dr and 7th St.)
Tour Stop 5: In front of "El Rancho" (southwest corner of Main Ave and 10th St.)
Tap the 3D-360 button to return to the 3D-360 experience
Download Tour Handout Map
Tour Stop 2: The future streetscape between College Dr and 8th St includes wider sidewalks, safety enhancements for all modes, expanded landscaping and water quality treatments, and more public spaces. The City and MIG team are completing the final design and engineering; this area will be Phase 1 for construction.
Tour Stop 5: The two "flexible" blocks between 9th and 11th St, as envisioned during the conceptual (preliminary) design process. These blocks have the same general dimensions as the rest of the corridor but are unique with a flush/curbless design, higher-end finishes, and special event infrastructure.
Tap the app buttons to switch between these two experiences.
Includes a 360 panorama background photo of downtown with a 3D model of the street improvements in the foreground. You can be offsite or onsite to learn from this experience.
This augmented and extended reality (AR/XR) experience turns on your phone's camera and projects the 3D model onto your screen. This experience is for use at tour stops 2 (in front of "Out of the Blue") or 5 (in front of "El Rancho").
By default, the app opens in 3D-360 mode at tour stop 2.